Sales proposal design concepts.

Concept proposals for fictional companies, built the way we'd build yours. Each is a live web proposal in the buyer's colors, with a matching PDF.

concepts to explore

40

every one ships as

Link + PDF

Alder & Finch Advisors proposal visual, concept work
Featured concept

Alder & Finch Advisors

Consulting · four generations · Concept work

Hollis, built to pass on

$1.6Mfixed fee, 18 months

A family furniture maker was handing over after four generations. As you scroll, the Hollis family tree redraws into a company with a board, a family council and an open CEO seat, and a switch moves eight real decisions from Sunday dinner to the board. Concept work for fictional companies.

  • Family tree to org chart
  • Who decides switch
  • Constitution tester
  • Buyout calculator
See how it was built
Kilnwright Partners proposal visual, concept work

Kilnwright Partners

Six kilns, one ledger to 2035

$5.4Mover 30 months

Consulting · six plants · Concept work

  • Kiln cross-section
  • Fuel and clinker console
  • Carbon ledger to 2035
  • Carbon-price payback
See how it was built
Emberline Systems proposal visual, concept work

Emberline Systems

Smoke just after 1 a.m. Dispatch knows eight minutes later.

$27Mover six years

Public sector · 148 camera sites · Concept work

  • Fire-night scrubber
  • Smoke-to-dispatch sequence
  • District rollout map
  • RFP compliance matrix
See how it was built
Shelfmark proposal visual, concept work

Shelfmark

Fourteen drawers. One library.

$9.8Mover five years

Public sector · 14 branches · Concept work

  • Card catalogue drawers
  • Catalogue search
  • A day at one branch
  • Cost per resident
See how it was built
Keeper proposal visual, concept work

Keeper

Every client, kept in time

$3.1Mover three years

Retail · 38 boutiques · Concept work

  • Crown-driven client journey
  • Boutique rollout dial
  • Platform teardown
  • Consent by market
See how it was built
Farewell & Co. proposal visual, concept work

Farewell & Co.

Security to gate, through the store

$46Mguaranteed over ten years

Retail · Terminal 2 · Concept work

  • Traveller drag
  • Flight-bank day scrubber
  • Corridor set piece
  • Traffic stress test
See how it was built
Tableside proposal visual, concept work

Tableside

Nobody misses the seventh standing in line

$72Mover seven seasons

Food and hospitality · 41,000 seats · Concept work

  • Full-game line scrubber
  • Order-ahead nudge
  • Seventh-inning set piece
  • Menu-board pricing
See how it was built
Galley & Co. proposal visual, concept work

Galley & Co.

Seven nights, seven courses

$14Mover three years

Food and hospitality · four ships · Concept work

  • Voyage chart
  • Port-buy slider
  • Sea-day service set piece
  • Waste plotted by port
See how it was built
Platewell Automation proposal visual, concept work

Platewell Automation

Ninety-six wells. One plan for Corrin's clone lab.

$6.2Mtwelve months

Life sciences · three workcells · Concept work

  • Plate-as-plan scrubber
  • One-cell set piece
  • Inspector evidence picker
  • Payback chart
See how it was built
Northwake Offshore proposal visual, concept work

Northwake Offshore

Gale Point, turning through the winter

$118Mover ten years

Clean energy · 64 turbines · Concept work

  • Turbine wind slider
  • Winter month scrubber
  • One-fault set piece
  • Fee-at-risk curve
See how it was built
Harbor Point Arena proposal visual, concept work

Harbor Point Arena

Ten years of big nights, under your name

$40Mten-year partnership

Sports and venues · $4M a year · Concept work

  • Arena inventory map
  • Game night scrubber
  • Term and escalator picker
  • Matching PDF
See how it was built
Sentry Nine proposal visual, concept work

Sentry Nine

Somebody tries the door just after 3 a.m.

$3.2Ma year, three-year term

Cybersecurity · six hospitals · Concept work

  • Incident replay
  • Six-hospital network map
  • Coverage builder
  • Matching PDF
See how it was built
Coldline Solar proposal visual, concept work

Coldline Solar

The cold stays on

$28.4M14 sites, solar and storage

Clean energy · 14 sites · Concept work

  • Sun-arc scrubber
  • 3 a.m. storm simulation
  • Site and financing picker
  • Matching PDF
See how it was built
Oak & Lantern proposal visual, concept work

Oak & Lantern

Casa Verano, drawn and built by one hand

$18.5Mguaranteed maximum price

Construction · 42 keys · Concept work

  • Sketch-to-room slider
  • Materials picker
  • Price ceiling breakdown
  • Permit-to-opening schedule
See how it was built
Quillmark Trials proposal visual, concept work

Quillmark Trials

Every month off enrollment is a month of runway kept

$13.75M26-month Phase II trial

Life sciences · Phase II · Concept work

  • Enrollment forecaster
  • Patient journey
  • Milestone payments
  • Matching PDF
See how it was built
Fieldhouse Provisions proposal visual, concept work

Fieldhouse Provisions

Twenty-two hearths, one larder

$11Ma year, three-year supply

Food and hospitality · 22 restaurants · Concept work

  • Seasonal dish builder
  • Dawn delivery route
  • Category and price-lock picker
  • Matching PDF
See how it was built
Roadline proposal visual, concept work

Roadline

Thirty-eight nights, every one of them happens

$9.6M38-date arena tour

Live entertainment · 38 dates · Concept work

  • Tour routing map
  • Breakdown rescue
  • Load-in day clock
  • Per-show cost builder
See how it was built
Fernhill proposal visual, concept work

Fernhill

One schedule for 600 technicians

$56per technician a month

SaaS · $400K enterprise rollout · Concept work

  • Live dispatch board
  • Go-live planner
  • Payback calculator
  • Region-by-region rollout
See how it was built
Marlow & Pike proposal visual, concept work

Marlow & Pike

Twelve months, one launch at a time

$100Ka month, one launch at a time

Agency · $1.2 million retainer · Concept work

  • Twelve-month skyline
  • Booking-pace curve
  • Campaign viewer
  • Break-even calculator
See how it was built
Holloway Build proposal visual, concept work

Holloway Build

Floors 12 to 14, built in four phases

2 of 3floors open for the whole build

Construction · $3 million bid · Concept work

  • 28-week section slider
  • Build-order comparison
  • Shutdown calendar
  • Live payment schedule
See how it was built
Paywright proposal visual, concept work

Paywright

Every Corvane colleague paid on time, in all 22 countries

$2.6Mthree-year payroll contract

SaaS · 22 countries · Concept work

  • Payday scrubber
  • 22-country tile map
  • Per-region pricing
  • Matching PDF
See how it was built
Waymark proposal visual, concept work

Waymark

340 coaches, 41 depots, one line

$1.9Mfive-year telematics contract

SaaS · 340 coaches · Concept work

  • Coach-on-the-line drag
  • Live operations board
  • Payback sliders
  • Depot fitting finder
See how it was built
Kindling Studio proposal visual, concept work

Kindling Studio

Your whisky got older and better. Your label just got older.

$680Kidentity, packaging and launch

Agency · six-bottle range · Concept work

  • Label age slider
  • Old and new shelf
  • Master Distiller's veto
  • Payment schedule
See how it was built
Halfcourt proposal visual, concept work

Halfcourt

Vantle drops. Halfcourt runs the room.

$1.4Mone-year retainer

Agency · drops all year · Concept work

  • Drop-day channel board
  • Live countdown
  • Drops-per-year pricing
  • Signer chapters
See how it was built
Granite & Vale Builders proposal visual, concept work

Granite & Vale Builders

Power on, Ridgeline Two

$186Mguaranteed maximum price

Construction · 24 MW · Concept work

  • Megawatt slider
  • Schedule and cash flow
  • GMP options
  • Commissioning levels
See how it was built
Ironbridge Facades proposal visual, concept work

Ironbridge Facades

Kestrel House gets a new face. Everyone stays home.

$24Mfixed, itemised

Construction · 22 storeys · Concept work

  • Facade platform drag
  • Floor-by-floor noise calendar
  • Wall section flip
  • Resident questions
See how it was built
Mortise Partners proposal visual, concept work

Mortise Partners

Harrow and Eastgate, one bank by Day 365

$7.8Mtwelve-month integration

Consulting · 112 branches · Concept work

  • Day 1 to Day 365 switch
  • Merged branch map
  • Close-weekend scrubber
  • Success fee option
See how it was built
Northline Advisory proposal visual, concept work

Northline Advisory

Take the heat off five o'clock

$3.2Mpilot and rollout

Consulting · 240 stores · Concept work

  • Store heat map
  • Change switches
  • Payback chart
  • Store manager chapter
See how it was built
Plainspoke proposal visual, concept work

Plainspoke

One front door for Port Alder

$4.1Mfive-year platform contract

Public sector · 33 requirements · Concept work

  • Resident journey stepper
  • Compliance matrix
  • Module pricing
  • Council chapter
  • RFP responses
See how it was built
Voltcrest Mobility proposal visual, concept work

Voltcrest Mobility

All 160 buses go electric by fall 2031

$38Mfive-year fleet contract

Public sector · 160 buses · Concept work

  • Five-year depot slider
  • Charging clock
  • Grant offsets
  • School board chapter
  • RFP responses
See how it was built
Northgate Ground proposal visual, concept work

Northgate Ground

Forty minutes, gate to gate

$26Mover five years

Logistics and infrastructure · 212 daily turns · Concept work

  • Turnaround Gantt
  • Delay ripple
  • Recovery playbook
  • Per-turn pricing
See how it was built
Valecroft Cellars proposal visual, concept work

Valecroft Cellars

One cellar list, poured the same in forty hotels

$7.2Ma year

Food and hospitality · 40 hotels · Concept work

  • Cellar shelf list builder
  • Pour across 40 hotels
  • By-the-glass pricing
  • General managers chapter
See how it was built
Ledgerline proposal visual, concept work

Ledgerline

Move the core over one weekend nobody notices

$18.5Mfixed price

SaaS · 1.4M accounts · Concept work

  • Cutover weekend scrubber
  • Rollback checkpoints
  • Parallel-run pricing
  • Risk chapter
See how it was built
Thornbury Living proposal visual, concept work

Thornbury Living

Two thousand beds, lit by September

$142Mguaranteed price

Construction · 2,000 beds · Concept work

  • Lit facade scrubber
  • Wet winter test
  • Halls by phase pricing
  • Trustees chapter
See how it was built
Saltmarsh Terminals proposal visual, concept work

Saltmarsh Terminals

Every ship turned inside eighteen hours

$64Mover seven years

Logistics and infrastructure · 6 cranes · Concept work

  • Vessel call scrubber
  • Lose-a-crane test
  • Yard dwell pricing
  • Port captain chapter
See how it was built
Ironvale Fitouts proposal visual, concept work

Ironvale Fitouts

Sixty gyms open in ninety days

$38Mtotal

Retail · 60 sites · Concept work

  • 90-day rollout board
  • Site floor plans
  • Overnight crew pricing
  • Opening-day checklist
See how it was built
Lumen & Lathe proposal visual, concept work

Lumen & Lathe

The exhibition opens in the dark

$4.6Mdesign and install

Agency · 14 galleries · Concept work

  • Spotlight and beam control
  • Conservation meter
  • Gallery scenes
  • Exposure chart
See how it was built
Fieldmark Water proposal visual, concept work

Fieldmark Water

Every tree gets the water it asks for

$12.8Minstalled

Logistics and infrastructure · 9,400 acres · Concept work

  • Season scrubber
  • Sensors by block
  • Dry-week test
  • Water rights chapter
See how it was built
Kestrel Fitouts proposal visual, concept work

Kestrel Fitouts

Forty stores refit overnight, open at nine

$21Mtotal

Retail · 40 stores · Concept work

  • Night shift scrubber
  • 40-store board
  • Handover sheet
  • Visual merchandising chapter
See how it was built
Orbitline proposal visual, concept work

Orbitline

Coverage where the map goes blank

$310Mten-year contract

Logistics and infrastructure · 48 satellites · Concept work

  • Coverage map scrubber
  • Homes connected counter
  • Capacity pricing
  • Regulatory chapter
See how it was built

Alder & Finch Advisors proposal visual, concept work
Featured concept

Alder & Finch Advisors

Consulting · four generations · Concept work

Hollis, built to pass on

$1.6Mfixed fee, 18 months

A family furniture maker was handing over after four generations. As you scroll, the Hollis family tree redraws into a company with a board, a family council and an open CEO seat, and a switch moves eight real decisions from Sunday dinner to the board. Concept work for fictional companies.

  • Family tree to org chart
  • Who decides switch
  • Constitution tester
  • Buyout calculator
See how it was built
Kilnwright Partners proposal visual, concept work

Kilnwright Partners

Six kilns, one ledger to 2035

$5.4Mover 30 months

Consulting · six plants · Concept work

  • Kiln cross-section
  • Fuel and clinker console
  • Carbon ledger to 2035
  • Carbon-price payback
See how it was built
Emberline Systems proposal visual, concept work

Emberline Systems

Smoke just after 1 a.m. Dispatch knows eight minutes later.

$27Mover six years

Public sector · 148 camera sites · Concept work

  • Fire-night scrubber
  • Smoke-to-dispatch sequence
  • District rollout map
  • RFP compliance matrix
See how it was built
Shelfmark proposal visual, concept work

Shelfmark

Fourteen drawers. One library.

$9.8Mover five years

Public sector · 14 branches · Concept work

  • Card catalogue drawers
  • Catalogue search
  • A day at one branch
  • Cost per resident
See how it was built
Keeper proposal visual, concept work

Keeper

Every client, kept in time

$3.1Mover three years

Retail · 38 boutiques · Concept work

  • Crown-driven client journey
  • Boutique rollout dial
  • Platform teardown
  • Consent by market
See how it was built
Farewell & Co. proposal visual, concept work

Farewell & Co.

Security to gate, through the store

$46Mguaranteed over ten years

Retail · Terminal 2 · Concept work

  • Traveller drag
  • Flight-bank day scrubber
  • Corridor set piece
  • Traffic stress test
See how it was built
Tableside proposal visual, concept work

Tableside

Nobody misses the seventh standing in line

$72Mover seven seasons

Food and hospitality · 41,000 seats · Concept work

  • Full-game line scrubber
  • Order-ahead nudge
  • Seventh-inning set piece
  • Menu-board pricing
See how it was built
Galley & Co. proposal visual, concept work

Galley & Co.

Seven nights, seven courses

$14Mover three years

Food and hospitality · four ships · Concept work

  • Voyage chart
  • Port-buy slider
  • Sea-day service set piece
  • Waste plotted by port
See how it was built
Platewell Automation proposal visual, concept work

Platewell Automation

Ninety-six wells. One plan for Corrin's clone lab.

$6.2Mtwelve months

Life sciences · three workcells · Concept work

  • Plate-as-plan scrubber
  • One-cell set piece
  • Inspector evidence picker
  • Payback chart
See how it was built
Northwake Offshore proposal visual, concept work

Northwake Offshore

Gale Point, turning through the winter

$118Mover ten years

Clean energy · 64 turbines · Concept work

  • Turbine wind slider
  • Winter month scrubber
  • One-fault set piece
  • Fee-at-risk curve
See how it was built
Harbor Point Arena proposal visual, concept work

Harbor Point Arena

Ten years of big nights, under your name

$40Mten-year partnership

Sports and venues · $4M a year · Concept work

  • Arena inventory map
  • Game night scrubber
  • Term and escalator picker
  • Matching PDF
See how it was built
Sentry Nine proposal visual, concept work

Sentry Nine

Somebody tries the door just after 3 a.m.

$3.2Ma year, three-year term

Cybersecurity · six hospitals · Concept work

  • Incident replay
  • Six-hospital network map
  • Coverage builder
  • Matching PDF
See how it was built
Coldline Solar proposal visual, concept work

Coldline Solar

The cold stays on

$28.4M14 sites, solar and storage

Clean energy · 14 sites · Concept work

  • Sun-arc scrubber
  • 3 a.m. storm simulation
  • Site and financing picker
  • Matching PDF
See how it was built
Oak & Lantern proposal visual, concept work

Oak & Lantern

Casa Verano, drawn and built by one hand

$18.5Mguaranteed maximum price

Construction · 42 keys · Concept work

  • Sketch-to-room slider
  • Materials picker
  • Price ceiling breakdown
  • Permit-to-opening schedule
See how it was built
Quillmark Trials proposal visual, concept work

Quillmark Trials

Every month off enrollment is a month of runway kept

$13.75M26-month Phase II trial

Life sciences · Phase II · Concept work

  • Enrollment forecaster
  • Patient journey
  • Milestone payments
  • Matching PDF
See how it was built
Fieldhouse Provisions proposal visual, concept work

Fieldhouse Provisions

Twenty-two hearths, one larder

$11Ma year, three-year supply

Food and hospitality · 22 restaurants · Concept work

  • Seasonal dish builder
  • Dawn delivery route
  • Category and price-lock picker
  • Matching PDF
See how it was built
Roadline proposal visual, concept work

Roadline

Thirty-eight nights, every one of them happens

$9.6M38-date arena tour

Live entertainment · 38 dates · Concept work

  • Tour routing map
  • Breakdown rescue
  • Load-in day clock
  • Per-show cost builder
See how it was built
Fernhill proposal visual, concept work

Fernhill

One schedule for 600 technicians

$56per technician a month

SaaS · $400K enterprise rollout · Concept work

  • Live dispatch board
  • Go-live planner
  • Payback calculator
  • Region-by-region rollout
See how it was built
Marlow & Pike proposal visual, concept work

Marlow & Pike

Twelve months, one launch at a time

$100Ka month, one launch at a time

Agency · $1.2 million retainer · Concept work

  • Twelve-month skyline
  • Booking-pace curve
  • Campaign viewer
  • Break-even calculator
See how it was built
Holloway Build proposal visual, concept work

Holloway Build

Floors 12 to 14, built in four phases

2 of 3floors open for the whole build

Construction · $3 million bid · Concept work

  • 28-week section slider
  • Build-order comparison
  • Shutdown calendar
  • Live payment schedule
See how it was built
Paywright proposal visual, concept work

Paywright

Every Corvane colleague paid on time, in all 22 countries

$2.6Mthree-year payroll contract

SaaS · 22 countries · Concept work

  • Payday scrubber
  • 22-country tile map
  • Per-region pricing
  • Matching PDF
See how it was built
Waymark proposal visual, concept work

Waymark

340 coaches, 41 depots, one line

$1.9Mfive-year telematics contract

SaaS · 340 coaches · Concept work

  • Coach-on-the-line drag
  • Live operations board
  • Payback sliders
  • Depot fitting finder
See how it was built
Kindling Studio proposal visual, concept work

Kindling Studio

Your whisky got older and better. Your label just got older.

$680Kidentity, packaging and launch

Agency · six-bottle range · Concept work

  • Label age slider
  • Old and new shelf
  • Master Distiller's veto
  • Payment schedule
See how it was built
Halfcourt proposal visual, concept work

Halfcourt

Vantle drops. Halfcourt runs the room.

$1.4Mone-year retainer

Agency · drops all year · Concept work

  • Drop-day channel board
  • Live countdown
  • Drops-per-year pricing
  • Signer chapters
See how it was built
Granite & Vale Builders proposal visual, concept work

Granite & Vale Builders

Power on, Ridgeline Two

$186Mguaranteed maximum price

Construction · 24 MW · Concept work

  • Megawatt slider
  • Schedule and cash flow
  • GMP options
  • Commissioning levels
See how it was built
Ironbridge Facades proposal visual, concept work

Ironbridge Facades

Kestrel House gets a new face. Everyone stays home.

$24Mfixed, itemised

Construction · 22 storeys · Concept work

  • Facade platform drag
  • Floor-by-floor noise calendar
  • Wall section flip
  • Resident questions
See how it was built
Mortise Partners proposal visual, concept work

Mortise Partners

Harrow and Eastgate, one bank by Day 365

$7.8Mtwelve-month integration

Consulting · 112 branches · Concept work

  • Day 1 to Day 365 switch
  • Merged branch map
  • Close-weekend scrubber
  • Success fee option
See how it was built
Northline Advisory proposal visual, concept work

Northline Advisory

Take the heat off five o'clock

$3.2Mpilot and rollout

Consulting · 240 stores · Concept work

  • Store heat map
  • Change switches
  • Payback chart
  • Store manager chapter
See how it was built
Plainspoke proposal visual, concept work

Plainspoke

One front door for Port Alder

$4.1Mfive-year platform contract

Public sector · 33 requirements · Concept work

  • Resident journey stepper
  • Compliance matrix
  • Module pricing
  • Council chapter
  • RFP responses
See how it was built
Voltcrest Mobility proposal visual, concept work

Voltcrest Mobility

All 160 buses go electric by fall 2031

$38Mfive-year fleet contract

Public sector · 160 buses · Concept work

  • Five-year depot slider
  • Charging clock
  • Grant offsets
  • School board chapter
  • RFP responses
See how it was built
Northgate Ground proposal visual, concept work

Northgate Ground

Forty minutes, gate to gate

$26Mover five years

Logistics and infrastructure · 212 daily turns · Concept work

  • Turnaround Gantt
  • Delay ripple
  • Recovery playbook
  • Per-turn pricing
See how it was built
Valecroft Cellars proposal visual, concept work

Valecroft Cellars

One cellar list, poured the same in forty hotels

$7.2Ma year

Food and hospitality · 40 hotels · Concept work

  • Cellar shelf list builder
  • Pour across 40 hotels
  • By-the-glass pricing
  • General managers chapter
See how it was built
Ledgerline proposal visual, concept work

Ledgerline

Move the core over one weekend nobody notices

$18.5Mfixed price

SaaS · 1.4M accounts · Concept work

  • Cutover weekend scrubber
  • Rollback checkpoints
  • Parallel-run pricing
  • Risk chapter
See how it was built
Thornbury Living proposal visual, concept work

Thornbury Living

Two thousand beds, lit by September

$142Mguaranteed price

Construction · 2,000 beds · Concept work

  • Lit facade scrubber
  • Wet winter test
  • Halls by phase pricing
  • Trustees chapter
See how it was built
Saltmarsh Terminals proposal visual, concept work

Saltmarsh Terminals

Every ship turned inside eighteen hours

$64Mover seven years

Logistics and infrastructure · 6 cranes · Concept work

  • Vessel call scrubber
  • Lose-a-crane test
  • Yard dwell pricing
  • Port captain chapter
See how it was built
Ironvale Fitouts proposal visual, concept work

Ironvale Fitouts

Sixty gyms open in ninety days

$38Mtotal

Retail · 60 sites · Concept work

  • 90-day rollout board
  • Site floor plans
  • Overnight crew pricing
  • Opening-day checklist
See how it was built
Lumen & Lathe proposal visual, concept work

Lumen & Lathe

The exhibition opens in the dark

$4.6Mdesign and install

Agency · 14 galleries · Concept work

  • Spotlight and beam control
  • Conservation meter
  • Gallery scenes
  • Exposure chart
See how it was built
Fieldmark Water proposal visual, concept work

Fieldmark Water

Every tree gets the water it asks for

$12.8Minstalled

Logistics and infrastructure · 9,400 acres · Concept work

  • Season scrubber
  • Sensors by block
  • Dry-week test
  • Water rights chapter
See how it was built
Kestrel Fitouts proposal visual, concept work

Kestrel Fitouts

Forty stores refit overnight, open at nine

$21Mtotal

Retail · 40 stores · Concept work

  • Night shift scrubber
  • 40-store board
  • Handover sheet
  • Visual merchandising chapter
See how it was built
Orbitline proposal visual, concept work

Orbitline

Coverage where the map goes blank

$310Mten-year contract

Logistics and infrastructure · 48 satellites · Concept work

  • Coverage map scrubber
  • Homes connected counter
  • Capacity pricing
  • Regulatory chapter
See how it was built

Alder & Finch Advisors proposal visual, concept work
Featured concept

Alder & Finch Advisors

Consulting · four generations · Concept work

Hollis, built to pass on

$1.6Mfixed fee, 18 months

A family furniture maker was handing over after four generations. As you scroll, the Hollis family tree redraws into a company with a board, a family council and an open CEO seat, and a switch moves eight real decisions from Sunday dinner to the board. Concept work for fictional companies.

  • Family tree to org chart
  • Who decides switch
  • Constitution tester
  • Buyout calculator
See how it was built
Kilnwright Partners proposal visual, concept work

Kilnwright Partners

Six kilns, one ledger to 2035

$5.4Mover 30 months

Consulting · six plants · Concept work

  • Kiln cross-section
  • Fuel and clinker console
  • Carbon ledger to 2035
  • Carbon-price payback
See how it was built
Emberline Systems proposal visual, concept work

Emberline Systems

Smoke just after 1 a.m. Dispatch knows eight minutes later.

$27Mover six years

Public sector · 148 camera sites · Concept work

  • Fire-night scrubber
  • Smoke-to-dispatch sequence
  • District rollout map
  • RFP compliance matrix
See how it was built
Shelfmark proposal visual, concept work

Shelfmark

Fourteen drawers. One library.

$9.8Mover five years

Public sector · 14 branches · Concept work

  • Card catalogue drawers
  • Catalogue search
  • A day at one branch
  • Cost per resident
See how it was built
Keeper proposal visual, concept work

Keeper

Every client, kept in time

$3.1Mover three years

Retail · 38 boutiques · Concept work

  • Crown-driven client journey
  • Boutique rollout dial
  • Platform teardown
  • Consent by market
See how it was built
Farewell & Co. proposal visual, concept work

Farewell & Co.

Security to gate, through the store

$46Mguaranteed over ten years

Retail · Terminal 2 · Concept work

  • Traveller drag
  • Flight-bank day scrubber
  • Corridor set piece
  • Traffic stress test
See how it was built
Tableside proposal visual, concept work

Tableside

Nobody misses the seventh standing in line

$72Mover seven seasons

Food and hospitality · 41,000 seats · Concept work

  • Full-game line scrubber
  • Order-ahead nudge
  • Seventh-inning set piece
  • Menu-board pricing
See how it was built
Galley & Co. proposal visual, concept work

Galley & Co.

Seven nights, seven courses

$14Mover three years

Food and hospitality · four ships · Concept work

  • Voyage chart
  • Port-buy slider
  • Sea-day service set piece
  • Waste plotted by port
See how it was built
Platewell Automation proposal visual, concept work

Platewell Automation

Ninety-six wells. One plan for Corrin's clone lab.

$6.2Mtwelve months

Life sciences · three workcells · Concept work

  • Plate-as-plan scrubber
  • One-cell set piece
  • Inspector evidence picker
  • Payback chart
See how it was built
Northwake Offshore proposal visual, concept work

Northwake Offshore

Gale Point, turning through the winter

$118Mover ten years

Clean energy · 64 turbines · Concept work

  • Turbine wind slider
  • Winter month scrubber
  • One-fault set piece
  • Fee-at-risk curve
See how it was built
Harbor Point Arena proposal visual, concept work

Harbor Point Arena

Ten years of big nights, under your name

$40Mten-year partnership

Sports and venues · $4M a year · Concept work

  • Arena inventory map
  • Game night scrubber
  • Term and escalator picker
  • Matching PDF
See how it was built
Sentry Nine proposal visual, concept work

Sentry Nine

Somebody tries the door just after 3 a.m.

$3.2Ma year, three-year term

Cybersecurity · six hospitals · Concept work

  • Incident replay
  • Six-hospital network map
  • Coverage builder
  • Matching PDF
See how it was built
Coldline Solar proposal visual, concept work

Coldline Solar

The cold stays on

$28.4M14 sites, solar and storage

Clean energy · 14 sites · Concept work

  • Sun-arc scrubber
  • 3 a.m. storm simulation
  • Site and financing picker
  • Matching PDF
See how it was built
Oak & Lantern proposal visual, concept work

Oak & Lantern

Casa Verano, drawn and built by one hand

$18.5Mguaranteed maximum price

Construction · 42 keys · Concept work

  • Sketch-to-room slider
  • Materials picker
  • Price ceiling breakdown
  • Permit-to-opening schedule
See how it was built
Quillmark Trials proposal visual, concept work

Quillmark Trials

Every month off enrollment is a month of runway kept

$13.75M26-month Phase II trial

Life sciences · Phase II · Concept work

  • Enrollment forecaster
  • Patient journey
  • Milestone payments
  • Matching PDF
See how it was built
Fieldhouse Provisions proposal visual, concept work

Fieldhouse Provisions

Twenty-two hearths, one larder

$11Ma year, three-year supply

Food and hospitality · 22 restaurants · Concept work

  • Seasonal dish builder
  • Dawn delivery route
  • Category and price-lock picker
  • Matching PDF
See how it was built
Roadline proposal visual, concept work

Roadline

Thirty-eight nights, every one of them happens

$9.6M38-date arena tour

Live entertainment · 38 dates · Concept work

  • Tour routing map
  • Breakdown rescue
  • Load-in day clock
  • Per-show cost builder
See how it was built
Fernhill proposal visual, concept work

Fernhill

One schedule for 600 technicians

$56per technician a month

SaaS · $400K enterprise rollout · Concept work

  • Live dispatch board
  • Go-live planner
  • Payback calculator
  • Region-by-region rollout
See how it was built
Marlow & Pike proposal visual, concept work

Marlow & Pike

Twelve months, one launch at a time

$100Ka month, one launch at a time

Agency · $1.2 million retainer · Concept work

  • Twelve-month skyline
  • Booking-pace curve
  • Campaign viewer
  • Break-even calculator
See how it was built
Holloway Build proposal visual, concept work

Holloway Build

Floors 12 to 14, built in four phases

2 of 3floors open for the whole build

Construction · $3 million bid · Concept work

  • 28-week section slider
  • Build-order comparison
  • Shutdown calendar
  • Live payment schedule
See how it was built
Paywright proposal visual, concept work

Paywright

Every Corvane colleague paid on time, in all 22 countries

$2.6Mthree-year payroll contract

SaaS · 22 countries · Concept work

  • Payday scrubber
  • 22-country tile map
  • Per-region pricing
  • Matching PDF
See how it was built
Waymark proposal visual, concept work

Waymark

340 coaches, 41 depots, one line

$1.9Mfive-year telematics contract

SaaS · 340 coaches · Concept work

  • Coach-on-the-line drag
  • Live operations board
  • Payback sliders
  • Depot fitting finder
See how it was built
Kindling Studio proposal visual, concept work

Kindling Studio

Your whisky got older and better. Your label just got older.

$680Kidentity, packaging and launch

Agency · six-bottle range · Concept work

  • Label age slider
  • Old and new shelf
  • Master Distiller's veto
  • Payment schedule
See how it was built
Halfcourt proposal visual, concept work

Halfcourt

Vantle drops. Halfcourt runs the room.

$1.4Mone-year retainer

Agency · drops all year · Concept work

  • Drop-day channel board
  • Live countdown
  • Drops-per-year pricing
  • Signer chapters
See how it was built
Granite & Vale Builders proposal visual, concept work

Granite & Vale Builders

Power on, Ridgeline Two

$186Mguaranteed maximum price

Construction · 24 MW · Concept work

  • Megawatt slider
  • Schedule and cash flow
  • GMP options
  • Commissioning levels
See how it was built
Ironbridge Facades proposal visual, concept work

Ironbridge Facades

Kestrel House gets a new face. Everyone stays home.

$24Mfixed, itemised

Construction · 22 storeys · Concept work

  • Facade platform drag
  • Floor-by-floor noise calendar
  • Wall section flip
  • Resident questions
See how it was built
Mortise Partners proposal visual, concept work

Mortise Partners

Harrow and Eastgate, one bank by Day 365

$7.8Mtwelve-month integration

Consulting · 112 branches · Concept work

  • Day 1 to Day 365 switch
  • Merged branch map
  • Close-weekend scrubber
  • Success fee option
See how it was built
Northline Advisory proposal visual, concept work

Northline Advisory

Take the heat off five o'clock

$3.2Mpilot and rollout

Consulting · 240 stores · Concept work

  • Store heat map
  • Change switches
  • Payback chart
  • Store manager chapter
See how it was built
Plainspoke proposal visual, concept work

Plainspoke

One front door for Port Alder

$4.1Mfive-year platform contract

Public sector · 33 requirements · Concept work

  • Resident journey stepper
  • Compliance matrix
  • Module pricing
  • Council chapter
  • RFP responses
See how it was built
Voltcrest Mobility proposal visual, concept work

Voltcrest Mobility

All 160 buses go electric by fall 2031

$38Mfive-year fleet contract

Public sector · 160 buses · Concept work

  • Five-year depot slider
  • Charging clock
  • Grant offsets
  • School board chapter
  • RFP responses
See how it was built
Northgate Ground proposal visual, concept work

Northgate Ground

Forty minutes, gate to gate

$26Mover five years

Logistics and infrastructure · 212 daily turns · Concept work

  • Turnaround Gantt
  • Delay ripple
  • Recovery playbook
  • Per-turn pricing
See how it was built
Valecroft Cellars proposal visual, concept work

Valecroft Cellars

One cellar list, poured the same in forty hotels

$7.2Ma year

Food and hospitality · 40 hotels · Concept work

  • Cellar shelf list builder
  • Pour across 40 hotels
  • By-the-glass pricing
  • General managers chapter
See how it was built
Ledgerline proposal visual, concept work

Ledgerline

Move the core over one weekend nobody notices

$18.5Mfixed price

SaaS · 1.4M accounts · Concept work

  • Cutover weekend scrubber
  • Rollback checkpoints
  • Parallel-run pricing
  • Risk chapter
See how it was built
Thornbury Living proposal visual, concept work

Thornbury Living

Two thousand beds, lit by September

$142Mguaranteed price

Construction · 2,000 beds · Concept work

  • Lit facade scrubber
  • Wet winter test
  • Halls by phase pricing
  • Trustees chapter
See how it was built
Saltmarsh Terminals proposal visual, concept work

Saltmarsh Terminals

Every ship turned inside eighteen hours

$64Mover seven years

Logistics and infrastructure · 6 cranes · Concept work

  • Vessel call scrubber
  • Lose-a-crane test
  • Yard dwell pricing
  • Port captain chapter
See how it was built
Ironvale Fitouts proposal visual, concept work

Ironvale Fitouts

Sixty gyms open in ninety days

$38Mtotal

Retail · 60 sites · Concept work

  • 90-day rollout board
  • Site floor plans
  • Overnight crew pricing
  • Opening-day checklist
See how it was built
Lumen & Lathe proposal visual, concept work

Lumen & Lathe

The exhibition opens in the dark

$4.6Mdesign and install

Agency · 14 galleries · Concept work

  • Spotlight and beam control
  • Conservation meter
  • Gallery scenes
  • Exposure chart
See how it was built
Fieldmark Water proposal visual, concept work

Fieldmark Water

Every tree gets the water it asks for

$12.8Minstalled

Logistics and infrastructure · 9,400 acres · Concept work

  • Season scrubber
  • Sensors by block
  • Dry-week test
  • Water rights chapter
See how it was built
Kestrel Fitouts proposal visual, concept work

Kestrel Fitouts

Forty stores refit overnight, open at nine

$21Mtotal

Retail · 40 stores · Concept work

  • Night shift scrubber
  • 40-store board
  • Handover sheet
  • Visual merchandising chapter
See how it was built
Orbitline proposal visual, concept work

Orbitline

Coverage where the map goes blank

$310Mten-year contract

Logistics and infrastructure · 48 satellites · Concept work

  • Coverage map scrubber
  • Homes connected counter
  • Capacity pricing
  • Regulatory chapter
See how it was built

A big deal gets forwarded. The same live link carries the whole story to everyone who signs off, and shows you which parts they read.

Concept proposal · one buyer

  • VP OperationsOpens Timeline
  • CFOOpens Pricing
  • Regional leadsOpen Timeline
  • LegalOpens The PDF
  • ProcurementOpens Pricing

FFernhillfor Calder Mechanical

Full rollout

600 technicians over 28 weeks

$400,000One signature page for the whole deal

  • VP OperationsTimeline
  • CFOPricing
  • Regional leadsTimeline
  • LegalThe PDF
  • ProcurementPricing
Signature
Signed
  • 01

    One link they can forward

  • 02

    A PDF that matches page for page

  • 03

    Updates after it's sent

A big deal gets forwarded. The same live link carries the whole story to everyone who signs off, and shows you which parts they read.

Concept proposal · one buyer

  • VP OperationsOpens Timeline
  • CFOOpens Pricing
  • Regional leadsOpen Timeline
  • LegalOpens The PDF
  • ProcurementOpens Pricing

FFernhillfor Calder Mechanical

Full rollout

600 technicians over 28 weeks

$400,000One signature page for the whole deal

  • VP OperationsTimeline
  • CFOPricing
  • Regional leadsTimeline
  • LegalThe PDF
  • ProcurementPricing
Signature
Signed
  • 01

    One link they can forward

  • 02

    A PDF that matches page for page

  • 03

    Updates after it's sent

A big deal gets forwarded. The same live link carries the whole story to everyone who signs off, and shows you which parts they read.

Concept proposal · one buyer

  • VP OperationsOpens Timeline
  • CFOOpens Pricing
  • Regional leadsOpen Timeline
  • LegalOpens The PDF
  • ProcurementOpens Pricing

FFernhillfor Calder Mechanical

Full rollout

600 technicians over 28 weeks

$400,000One signature page for the whole deal

  • VP OperationsTimeline
  • CFOPricing
  • Regional leadsTimeline
  • LegalThe PDF
  • ProcurementPricing
Signature
Signed
  • 01

    One link they can forward

  • 02

    A PDF that matches page for page

  • 03

    Updates after it's sent

Tell us the deal in a line. We'll read it and come back with a plan and a price.

Try
  • Live web proposal and PDF
  • From $5K
  • 50 percent to start
See the work

Tell us the deal in a line. We'll read it and come back with a plan and a price.

Try
  • Live web proposal and PDF
  • From $5K
  • 50 percent to start
See the work

Tell us the deal in a line. We'll read it and come back with a plan and a price.

Try
  • Live web proposal and PDF
  • From $5K
  • 50 percent to start
See the work